Pixel Perfect Creation — digital engineering agency. Web development, app development, custom software, Shopify build-outs, interactive dashboards, data normalization, hard-target scraping, database optimization, A/B testing & UX, workflow automation, AI selection & guardrails, developer takeovers — any language.

DIGITAL ENGINEERING AGENCY
ANY STACK / ANY LANGUAGE
Make every pixel part of your story
SCROLL ⌄

The difference between average and premium lives in the details. The pixels. The motion. The speed. The flow. We build the parts that make your product feel sharp, trusted, and complete.

01 — THE BELIEF PIXEL PERFECT CREATION
01 / SURFACEWhat your customers see
halcyon-gear.com ●
BAG (2)

GEAR FOR THE
UNREASONABLE

EXPEDITION EQUIPMENT — BUILT, NOT BRANDED

SHOP THE DROP
VESTA PARKA — $480
KIRUNA PACK — $260
NORD TENT — $890
NEW DROP
WEB · APPS · CUSTOM SOFTWARE · SHOPIFY — keep scrolling into the button
02 / SIGNALWhat your numbers say
LIVE — HALCYON / FUNNEL v9 REFRESHED 4s AGO
CONVERSION+38.4%
LCP0.9s
CART ABANDON−12.1%
← A/B VARIANT “EXACT” SHIPPED HERE
WEEKLY REVENUE — NORMALIZED
DASHBOARDS · A/B TESTING · UX — dive into the data point
03 / SOURCEWhat makes it run
pipeline.tsscraper.pyschema.sqlguardrails.yml

01// inherited from previous devs — 04:12 AM

02import { normalize, dedupe } from "./chaos";

03const truth = await normalize(scrape("the-unscrapable"));

04db.optimize({ indexes: "rebuilt", queries: "10x" });

05ai.guard({ model: pick("right-one"), leash: true });

06

07const pixel = place(x, y, { exact: true });

08// ^ this one. this is the one that matters.

$ ppc deploy --exact

✓ 0 regressions · 214ms · every pixel accounted for

DATA · SCRAPING · DB OPTIMIZATION · AUTOMATION · AI — zoom into the cursor

Zoom far enough, and everything you’ve ever shipped
is just pixels. We place every one on purpose.

04 / THE PIXEL — 1×1, #FF2A1F, exactly where it should be

02 — THE ARSENAL

Everything we build

Eighteen disciplines. One obsession. If it renders, computes, syncs or sells — we build it exactly.

03 - THE PROOF

Selected work

Live products, operational tools, school systems, dashboards and Shopify apps captured from the actual sites or local projects.

LIVE HIPAA SYSTEM ScriptBridge Prior Authorization & Healthcare Platform preview
01 / CASE STUDY HEALTHCARE PLATFORM · PRIOR AUTH AUTOMATION

ScriptBridge Prior Authorization & Healthcare Platform

A mission-critical digital health platform engineered to streamline the entire prior authorization lifecycle between specialty pharmacies, prescribing physicians, and insurance payers.

AWS SERVERLESSAWS LAMBDAHIPAA COMPLIANT
WEBGL 3D ENGINE LumiPlan 3D Architectural Lighting & Photometric Studio preview
02 / CASE STUDY 3D LIGHTING & ARCHITECTURAL SIMULATION

LumiPlan 3D Architectural Lighting & Photometric Studio

A high-performance in-browser WebGL and Three.js architectural lighting simulator engineered for real-time photometric calculation, fixture positioning, and physical material rendering.

THREE.JSWEBGL3D SIMULATION
LIVE PLATFORM JobsGemach Community Job Board & Recruiting Engine preview
03 / CASE STUDY COMMUNITY JOB BOARD & RECRUITING ENGINE

JobsGemach Community Job Board & Recruiting Engine

A community-driven employment marketplace and verified job board connecting local job seekers with trusted employers across industries.

RECRUITMENT PLATFORMCOMMUNITY TECHINSTANT FILTERING
LIVE PLATFORM GRC Oversight Continuous Compliance & Audit Ledger preview
04 / CASE STUDY ENTERPRISE COMPLIANCE & RISK LEDGER

GRC Oversight Continuous Compliance & Audit Ledger

A specialized compliance management platform providing continuous visibility, audit evidence collection, and automated control verification for regulated organizations.

SOC 2HIPAA AUDITGRC PLATFORM
LIVE CHARITY Ezreinu Services Community Support & Assistance Portal preview
05 / CASE STUDY NON-PROFIT & COMMUNITY ASSISTANCE

Ezreinu Services Community Support & Assistance Portal

A dignified, accessible digital gateway for community aid, emergency financial relief, family crisis intervention, and volunteer coordination.

NON-PROFITCOMMUNITY PORTALDONATION ENGINE
SHOPIFY PLUS Bespop Shopify Plus Agency Platform & Merchant Systems preview
06 / CASE STUDY SHOPIFY PLUS AGENCY & BRAND EXPERIENCE

Bespop Shopify Plus Agency Platform & Merchant Systems

A premier digital flagship and engineering portfolio for an e-commerce development agency specializing in high-volume Shopify Plus enterprise storefronts.

SHOPIFY PLUSAGENCY PLATFORMECOMMERCE ARCHITECTURE
SHOPIFY APP Bespop Age Gate Compliance App for Shopify preview
07 / CASE STUDY SHOPIFY APP ECOSYSTEM

Bespop Age Gate Compliance App for Shopify

A regulatory compliance storefront app for Shopify merchants selling age-restricted goods, combining legally binding age verification with zero conversion friction.

SHOPIFY APPTHEME EXTENSIONSAGE VERIFICATION
APP FLEET Bespop Enterprise 10-App Fleet & Icon System preview
08 / CASE STUDY APP SUITE ENGINEERING & BRAND SYSTEMS

Bespop Enterprise 10-App Fleet & Icon System

A comprehensive fleet of 10 utility and conversion apps for Shopify merchants, backed by a unified icon identity system and scalable cloud architecture.

APP STORE DESIGNICON DESIGN SYSTEMSHOPIFY POLARIS
MESSAGING CLIENT Vutsapp Web Desktop Messaging & Group Workspace preview
09 / CASE STUDY DESKTOP MESSAGING CLIENT

Vutsapp Web Desktop Messaging & Group Workspace

A desktop web messaging client engineered for high-volume community channels, keyboard navigation, and seamless media sharing.

MESSAGING CLIENTVIRTUAL SCROLLINGDESKTOP WEB
MOBILE APP Vutsapp Mobile Community Lifestyle & Zmanim Hub preview
10 / CASE STUDY MOBILE APPLICATION & COMMUNITY UTILITIES

Vutsapp Mobile Community Lifestyle & Zmanim Hub

A mobile application uniting community communication with daily Jewish lifecycle utilities, accurate GPS prayer times (zmanim), and local service bulletins.

MOBILE UXZMANIM ENGINECOMMUNITY APP
AUDIO ENGINE Vutsapp Conversation Surface & Waveform Audio Engine preview
11 / CASE STUDY REAL-TIME AUDIO & CONVERSATION SURFACE

Vutsapp Conversation Surface & Waveform Audio Engine

A refined conversational chat UI featuring real-time Web Audio waveform visualization, variable-speed voice note playback, and precise audio scrubber controls.

WEB AUDIO APIWAVEFORM VISUALIZERVOICE NOTES
LIVE STREAMING FrumTube Filtered Video Streaming Platform preview
12 / CASE STUDY VIDEO STREAMING PLATFORM

FrumTube Filtered Video Streaming Platform

A video streaming portal curated for kosher entertainment and educational content, featuring automated moderation workflows and adaptive bitrate playback.

VIDEO STREAMINGFILTERED PLATFORMCDN DELIVERY
LIVE CHARITY Tzedoka.org Digital Philanthropy & Campaign Engine preview
13 / CASE STUDY DIGITAL PHILANTHROPY & FUNDRAISING

Tzedoka.org Digital Philanthropy & Campaign Engine

A digital philanthropy platform empowering charitable institutions to launch high-conversion emergency fundraisers, matching campaigns, and recurring donor programs.

DIGITAL PHILANTHROPYFUNDRAISING ENGINEREAL-TIME TICKER
LIVE AUCTION Sinai Charity Auction Event Bidding Engine preview
14 / CASE STUDY EVENT BIDDING ENGINE & HIGH-CONCURRENCY SYSTEM

Sinai Charity Auction Event Bidding Engine

A high-concurrency digital auction and ticket bidding engine built for an annual charity gala, driving tens of thousands of dollars in real-time prize ticket sales.

AUCTION ENGINECHARITY GALATICKET ALLOCATION
COMMUNITY HUB Sinai Business Hub Community Directory preview
15 / CASE STUDY COMMUNITY DIRECTORY & B2B MARKETPLACE

Sinai Business Hub Community Directory

A community commercial directory and business exchange connecting local trades, professionals, and service providers with residents and clients.

COMMUNITY DIRECTORYLOCAL BUSINESSFACETED SEARCH
DEV TOOL Statometer Local-First Git Activity Dashboard preview
16 / CASE STUDY DEVELOPER TOOLING & GIT ANALYTICS

Statometer Local-First Git Activity Dashboard

A privacy-first developer dashboard that parses local Git repositories to visualize commit cadence, code churn, and development velocity without external cloud tracking.

GIT ANALYTICSLOCAL FIRSTDEV TOOLS
DATA CONSOLE Kendo Grid Nav High-Density Operational Console preview
17 / CASE STUDY HIGH-DENSITY OPERATIONAL REPORTING

Kendo Grid Nav High-Density Operational Console

An enterprise financial and operational reporting console engineered for keyboard-first navigation across massive tabular datasets with zero rendering latency.

ENTERPRISE CONSOLEDATA GRIDVIRTUALIZATION
CANVAS APP Wheel of Names High-Framerate Canvas Picker Engine preview
18 / CASE STUDY HIGH-FRAMERATE CANVAS ENGINE

Wheel of Names High-Framerate Canvas Picker Engine

A high-framerate HTML5 Canvas random name picker wheel featuring realistic rotational physics, synthesized ticking audio, and interactive celebration effects.

HTML5 CANVASPHYSICS ENGINEWEB AUDIO SYNTH
OFFLINE STUDIO Open-Shop Offline Photo & Vector Studio preview
19 / CASE STUDY IN-BROWSER CREATIVE SUITE · GRAPHICS ENGINE

Open-Shop Offline Photo & Vector Studio

A professional-grade, zero-telemetry in-browser photo and vector graphics studio with hardware-accelerated WebGL filters, layer compositing, and full PSD/XCF/RAW/SVG format support.

WEBGLHTML5 CANVASIMAGE PROCESSING
0¢ DISPATCH ZilchSMS Zero-Cost Carrier SMS Dispatch Engine preview
20 / CASE STUDY TELECOM INFRASTRUCTURE · ZERO-COST SMS GATEWAY

ZilchSMS Zero-Cost Carrier SMS Dispatch Engine

A zero-marginal-cost group messaging and telecom gateway built in Go that routes high-volume SMS dispatches through cellular Email-to-SMS gateways with double opt-in compliance.

GOLANGTELECOMPOSTGRESQL
DETERMINISTIC TaxShmax Deterministic Sales Tax & Exemption Engine preview
21 / CASE STUDY FINTECH TAX ENGINE · MULTI-PROTOCOL COMPLIANCE

TaxShmax Deterministic Sales Tax & Exemption Engine

A transparent, deterministic sales tax calculation engine with exact Decimal arithmetic, bitemporal jurisdiction rates, fail-closed locality evaluation, and drop-in TaxJar/Stripe/Avalara adapters.

PYTHON 3.12FINTECHTAX ENGINE
MODULAR MONOLITH SiteLens / CJM Construction Takeoff & Drawing Platform preview
22 / CASE STUDY CONSTRUCTION INTELLIGENCE · 2D/3D BLUEPRINTS

SiteLens / CJM Construction Takeoff & Drawing Platform

An enterprise-grade multi-tenant construction drawing intelligence and takeoff platform migrated from a bloated 6-microservice stack to an ultra-lean Go modular monolith on Google Cloud.

GOLANGPOSTGRESQLCONSTRUCTION TECH
AI FULFILLMENT SMM AI Content Studio & Media Fulfillment Engine preview
23 / CASE STUDY AI CONTENT MARKETING · MULTI-CHANNEL FULFILLMENT

SMM AI Content Studio & Media Fulfillment Engine

A standalone Go and embedded static SPA social marketing platform coordinating Gemini and local AI agents to draft 7-channel campaigns with structured 13-file fulfillment packaging.

GOLANGGEMINI APISQLITE
SINGLE BINARY FlowERP Single-Binary Enterprise Resource Planning preview
24 / CASE STUDY ENTERPRISE ERP · DOUBLE-ENTRY FINANCIALS

FlowERP Single-Binary Enterprise Resource Planning

A 23MB single-binary enterprise ERP engine in Go with embedded Svelte SPA delivering sub-5ms API response times, double-entry General Ledger, and perpetual moving-average inventory valuation.

GOLANGPOSTGRESQLSVELTE
MULTI-CLI RELAY Agent Orchestra Multi-CLI Autonomous Coding Relay preview
25 / CASE STUDY MULTI-AGENT ORCHESTRATION · AUTONOMOUS CODING

Agent Orchestra Multi-CLI Autonomous Coding Relay

A trust-minimal, config-driven orchestrator coordinating local Claude Code, OpenAI Codex, and Google Antigravity CLIs through a 4-phase relay with automatic token-exhaustion failover.

TYPESCRIPTNODE.JSAI ORCHESTRATION
SUB-10MS LATENCY NoMoreSlowAgent (NMSA) Speed-First Local Workspace preview
26 / CASE STUDY SPEED-FIRST WORKSPACE · HIGH-THROUGHPUT AI RETRIEVAL

NoMoreSlowAgent (NMSA) Speed-First Local Workspace

A speed-first local workspace and source retrieval engine in Go that streams pre-turn SQLite repository context to AI coding agents via stdin in under 10ms with sub-1% idle CPU.

GOLANGSQLITEDEVELOPER TOOLS
SPECIALTY — HEALTHCARE

Compliance,
audited to the pixel

Healthcare software carries different stakes. We audit and review HIPAA-grade systems — PHI handling, access controls, audit trails, vendor risk — then fix what we find and keep it fixed. Scheduled reviews, improvements that actually ship, and documentation your auditor accepts on the first pass.

HIPAAPHI SAFEGUARDSACCESS CONTROLSAUDIT TRAILSSOC 2 READINESSVENDOR / BAA REVIEW
COMPLIANCE AUDIT — Q3 0 OPEN FINDINGS
  • PHI encryption — at rest / in transitPASS
  • Access controls & least privilegePASS
  • Audit trail — every read, every writeREBUILT
  • Session & device policiesHARDENED
  • Vendor risk / BAA coverageCURRENT
  • Breach-response runbookDRILLED
RE-AUDIT SCHEDULED · IMPROVEMENTS SHIPPED · EVIDENCE ARCHIVED
THE METHOD — 01/04

INHERIT

We take over codebases other developers left behind. Any stack, any language, any state of despair. No rewrite-everything speeches — we read the code, map the bodies, and ship your next release.

LEGACY RESCUEZERO-DOC ONBOARDINGANY LANGUAGE
THE METHOD — 02/04

EXTRACT

The data “that can’t be scraped,” scraped. Then normalized, deduplicated and delivered as one clean source of truth your whole company can finally agree on.

HARD-TARGET SCRAPINGNORMALIZATIONDB OPTIMIZATION
THE METHOD — 03/04

GOVERN

We choose the right AI for the job — not the loudest one — then build the guardrails that keep it accurate, on-brand and out of the news. Automation for the workflows, leashes for the models.

MODEL SELECTIONAI GUARDRAILSWORKFLOW AUTOMATION
THE METHOD — 04/04

PROVE

A/B tested, measured, optimized — forever. We don’t tell you the redesign worked; we show you the graph. Every decision earns its place in the interface, or it leaves.

A/B TESTINGUX OPTIMIZATIONLIVE REPORTING
PIXEL PERFECT CREATION

Make every pixel
part of your story

IT’S RIGHT THERE. IT’S BEEN WITH YOU THE WHOLE TIME.

04 — THE BEGINNING

Start your
story

Tell us what you’re building — or what someone else left half-built. We reply within one business day, usually faster.